Enclosures & cabinets
Control boxes, electrical cabinets, charger housings and junction boxes. 1.5–3 mm CRS, galvanized or stainless, powder coated to your RAL.
Specs & MOQ →We cut, bend, weld, coat and assemble — all under one roof. Send a drawing and you get a price within 24 hours on a complete drawing, a first article before the run, and photos before the container closes.
PDF, STEP, DXF or a photo of a part. No account, no form fatigue — one page.
We are not a marketplace and we are not a trading company. These are the parts we build every week.
Control boxes, electrical cabinets, charger housings and junction boxes. 1.5–3 mm CRS, galvanized or stainless, powder coated to your RAL.
Specs & MOQ →Welded bases, machine frames, guards and covers for automation and packaging equipment. Jig-welded for squareness, so parts fit after coating.
Specs & MOQ →Counters, sinks, hoods, shelves and custom units in 304 or 316L, 16–20 ga, #4 or #8 finish. TIG welded and blended so the seam disappears.
Specs & MOQ →Every step happens in-house — that is why we can promise a date instead of an estimate.
Fiber laser, 0.5–12 mm. CRS, galvanized, stainless and aluminum. Clean edge, no secondary finishing.
Turret punch up to 6 mm. Faster per part than laser at 500 pcs and up, with lower tooling cost.
Press brakes up to 4 m; flange length ±0.30 mm. First part checked, then every 25 pieces.
MIG, TIG and spot. Jigs keep frames square. Stainless welds ground, blended and passivated.
Powder coating 60–120 µm at 180 °C, zinc and nickel plating, anodizing, silk screen and laser marking.
Hardware, inserts, sub-assembly and export-grade cartons. Packing photos sent before the container closes.
Fastest 15 working days, counted from drawing approval and deposit received. Transit time is not included.
Drawing, quantity, finish, target date.
Price, lead time and what we would change.
First article with report. You approve before the run.
Cut, bend, weld, finish. Photos at each stage.
Dimensional and visual. Packing photos to you.
FOB Shenzhen / Yantian, or DDP to your door.
Day 0 = drawing approved and deposit received. Transit time is not included. If the drawing is incomplete or the order is rush, we will tell you before you commit.
Mill certificates and RoHS/REACH declarations on request, with every batch.
| Material | Grades | Thickness | Typical use |
|---|---|---|---|
| Cold-rolled steel | SPCC / CRS | 0.5 – 6.0 mm | Enclosures, brackets, frames |
| Galvanized steel | SGCC / HDG | 0.5 – 4.0 mm | Outdoor cabinets, ducting, racks |
| Stainless steel | 304 / 316L | 0.5 – 8.0 mm | Food service, washdown, outdoor |
| Aluminum | 5052 / 6061 | 0.8 – 10.0 mm | Lightweight panels, covers, housings |
| Copper & brass | C110 / H62 | 0.5 – 3.0 mm | Busbar supports, shielding, contacts |
A defect caught after powder coating costs ten times more than one caught at the brake. So we check before the cost is locked in.
A cabinet builder in California needed 1,000 large industrial cabinets on a fixed delivery schedule. The challenge was volume and pacing, not one difficult part.
Eight weeks counted from drawing approval and deposit — transit not included.
50 pieces per part number for production. For prototypes we run 1–5 pieces with a one-time setup charge, and the setup is credited back on the first production order.
Within 24 hours for a drawing with quantity, material and finish. If something is missing, we will suggest a standard rather than wait.
Yes. Standard terms are FOB Shenzhen or Yantian. We can quote CIF or DDP to your door on request, including duties where you want a landed number.
PDF, STEP, DXF or DWG for the geometry. A photo of an existing part works too — we will measure it and send the drawing back for approval.
Yes. Every batch ships with the mill certificate and a dimensional report. New parts get a first-article inspection (FAI) package.
50% deposit to start production, 50% before shipment. Long-term customers can discuss other terms after three completed orders. We accept T/T and can invoice in USD.
±0.20 mm on laser-cut features and ±1.0° on bend angles by default. Tighter features we review case by case — send the drawing and we will tell you honestly whether we can hold it, before you order.
Send photos and the inspection report. We rework or remake at our cost and cover the return freight.
No — we are not a UL-listed factory. What we do supply is the paperwork a UL auditor asks for: material certificates, dimensional reports, process records and traceable batch numbers. Customers who hold the listing assemble and certify the finished product; we build the enclosure to their UL 508A / 9540 requirements. If your project needs a listed supplier, tell us early and we will say plainly whether we fit.
Fastest 15 working days, counted from drawing approval and deposit received — transit is not included. Incomplete drawings, first-article approval and rush orders all move that date, and we confirm it in writing before you commit.
One page, six fields, no sales call unless you ask for one.